Completed Projects

The Construction of Sir Anerood Jugnauth (SAJ) Bridge

On the 11th April 2018, the Government of Mauritius and the Road Development Authority (RDA) launched the construction of the A1 M1 link as part of the Road Decongestion Program. This multi billion mega project will improve the distribution of traffic within the network of A1 Road and M1 Motorway. Traffic from Port Louis through …

The Construction of Sir Anerood Jugnauth (SAJ) Bridge Read More »

Construction of footbridge near Nicolay Bridge along Port-Louis-Central Flacq road (A2) at St Croix

The existing bridge is located along B117 Road. It is approximately 14m long and 6m wide and is made up of steel plate resting on arch steel girders supported by masonry abutments at the two extremities. The absence of footpath along the bridge represented a potential hazard for pedestrians. Moreover, the existing bridge is showing …

Construction of footbridge near Nicolay Bridge along Port-Louis-Central Flacq road (A2) at St Croix Read More »

Design-Build/Turnkey for countermeasure works to slope failure at Montagne Ory

The Road Development Authority is actually implementing the countermeasure works to slope failure at Montagne Ory along classified road B46.  Landslides, rockfall and soil erosion were frequently observed notably during rainy period. To mitigate these risks to provide a level of safety to road users, the RDA worked out a scope of works and a …

Design-Build/Turnkey for countermeasure works to slope failure at Montagne Ory Read More »

Upgrading of Constance Bridge along B117 Road at St Remi Road

The existing bridge is located along B117 Road. It is approximately 14m long and 6m wide and is made up of steel plate resting on arch steel girders supported by masonry abutments at the two extremities.   The absence of footpath along the bridge represented a potential hazard for pedestrians. Moreover, the existing bridge is …

Upgrading of Constance Bridge along B117 Road at St Remi Road Read More »

Traffic Congestion Relieving Measures at B32/B143 Junction (Vallee des Pretres Region)

Vallee des Pretres is a highly built-up area, situated in Port Louis. Its main access and exit point is along Bernardin de St Pierre Road (B143), which connects to Abdool Razack Mohamed and Pamplemousse streets (B32). The second major junction in this region is the Military Road/A. R. Mohamed junction which connects Quay D to …

Traffic Congestion Relieving Measures at B32/B143 Junction (Vallee des Pretres Region) Read More »

CONSTRUCTION OF A FLYOVER AT PALMERSTONE VACOAS

With the increasing growth of traffic over the last decade, the existing road configuration from Vacoas up to Palmerstone junction and Jumbo roundabout are subjected to chronic traffic congestion. Besides, with the implementation of the Metro Express project, only one lane will be available for traffic. And this will lead to even more congestion, increase …

CONSTRUCTION OF A FLYOVER AT PALMERSTONE VACOAS Read More »

Takamaka Bridge

On 27 April 2021, further to torrential rainfall in the region of Vacoas bridges found along Takamaka River were flooded. Following the flooding event, Land Drainage Authority (LDA) recommended the reconstruction of the Takamaka bridge along Vacoas-La Marie Road (B64) under the National Flood Management Programme (NFMP). The Contractor was selected from RDA Framework Agreement …

Takamaka Bridge Read More »