Invitation for Bids
- E/RDA/EOI/54/04-2022 - Vertical Landscaping at Hillcrest and green spaces, Jumbo, Phoenix, Dowlut and Valentina Flyovers
- CPB/20/2022 - Construction of a Fly-over on Motorway M2 at Terre-Rouge Roundabout (Design-Build/Turnkey).
- E/C/RDA/21/10-2021 - Consultancy services for the Feasibility Study of a Dual Carriageway linking SSR International Airport -Souillac- Motorway M1
- E/W/RDA/57/04-22 - Rehabilitation of Footbridge Oxenham and Underpass at Trianon, Along MotorwayM1
- E/W/RDA/56/04-22 - Rehabilitation of footbridge at Camp Fouquereaux along Motorway M1
- CPB/10/2022 - Construction of Bois Cheri Bypass
- RDA/IFB/2022/258 - Supply, Testing and Commissioning of Double Cabin 2x4 Pick Up Van
- CPB/77/2021 - CONSTRUCTION OF A GRADE SEPARATED JUNCTION TO LINK THE PROPOSED VERDUN BYPASS AND ST PIERRE BYPASS
- E/OAB/RDA/49/01-2022 - Construction of a New RDA sub-office at Helvetia, Moka
- CPB/62/2021 - Construction of a Grade Separated Junction at Wooton
- Agreement for the Erection, maintenance and Management of Totem between the Road Development Authority and Agencies to harmonise the Totems system across the island
- E/W/RDA/24/12-21 - The Procurement for Vegetation Control along Motorways (Zone North, East, Central and South)
- E/W/RDA/26/11-21 - Upgrading of Constance Bridge along B117 Road at St Remi
- CPB/56/2021 - Construction of a Bridge at Baie Du Tombeau (in lieu of Pont Bruniquel)
- E/W/RDA/23/10-2021 - Upgrading of B28 Road (Lot 3 – Phase 2) From Beau Champ to Bel Air
- E/W/RDA/26/01-2021 - Framework Agreement for Upkeeping and Associated Minor Routine Works Along Classified Roads
- E/G/RDA/09/08-2021 - Supply and Delivery of Guardrails and Accessories
- Sale of Scrapped Metals and Used Photocopying Machine
- E/CSF/RDA/07/07-2021 - Framework agreement for consultancy services for roads, bridges, drains, and allied projects
- E/W/RDA/53/05-21 - Slope Failure at Rivière des Créoles Along A15 – Stabilisation Works (Design & Build/Turnkey)
- CPB/25/2021 - Interchange constructions and Improvements along M3-A14 corridor at Ebene
- E/W/RDA/51/05-2021 - Design - Build/Turnkey for Purging of Rock & Provision of Rock Net at Maconde Cliff
- CPB/59R/2020 - Construction of a flyover at Quay D Roundabout (Design-Build/Turnkey)
- RDA/IFB/2021/164 - Construction of La Brasserie - Beaux Songes Link Road (Phase 2)
- E/W/RDA/46/04-2021 - Rehabilitation of Cavendish Bridge at Ville Noire
- E/S/RDA/27/01-21 - Supply, Installation, Configuration and Commissioning of an electronic Document Management System (eDMS) at the RDA
- E/EOI/RDA/33/03-2021 - Consultancy Services for the Development and Implementation of a Road Asset Management System for the RDA
- CPB/59/2020 - Construction of a Flyover at Quay D Roundabout
- CPB/52/2020 - Construction of Verdun Bypass
- E/W/RDA/30/01-21 - Drainworks along A10 Road at Nouvelle France
- E/W/RDA/23/10-2020 - Construction of a Bridge at Baie Du Tombeau (in lieu of Pont Bruniquel)
- RDA/IFB/2020/66 - MOTORWAY M4 FROM AIRPORT TO FORBACH – PHASE 1: CONSTRUCTION OF A SINGLE CARRIAGEWAY FROM BEL AIR TO PONT BLANC
- EW/RDA/03/07-2020 - Design & Build/Turnkey for Countermeasure Works to Slope Failure at Souillac Bridge
- RDA/IFB/2020/46 - Invitation for Bids - Construction of Saint Denis Bridge at Chamarel
- W/RDA/33/06-2020 - INVITATION FOR BIDS WITHIN A FRAMEWORK AGREEMENT FOR ROAD MAINTENANCE AND MINOR WORKS (2020-2023)
- E/W/RDA/17/12-19 - Counter Measures Works to Slope Failure at Montagne Ory (Design-Build/Turnkey)
- E/W/RDA/23/02-20 - Rehabilitation of Cavendish Bridge at Ville Noire
- RDA/IFB/2019/24 - LANDSLIDE/ SLOPE STABILITY TREATMENT ALONG B104 ROAD (BAIE DU CAP – CHAMAREL – CASE NOYALE) AT CHAMAREL