On Going Projects

Rehabilitation of Napoléon Bridge at L’Avenir on Ripailles – Nicolière Road (B49)

The bridge was constructed in 1965 and is located on B49 Road next to L’Avenir Temple. It is approximately 35m long and 5.5m wide and is made up of a reinforced concrete deck resting on 3 Nos. reinforced concrete beams supported by an intermediate masonry pier and masonry abutments.  The absence of footpath along the …

Rehabilitation of Napoléon Bridge at L’Avenir on Ripailles – Nicolière Road (B49) Read More »

Design-Build/Turnkey for countermeasure works to slope failure at Montagne Ory

The Road Development Authority is actually implementing the countermeasure works to slope failure at Montagne Ory along classified road B46.  Landslides, rockfall and soil erosion were frequently observed notably during rainy period. To mitigate these risks to provide a level of safety to road users, the RDA worked out a scope of works and a …

Design-Build/Turnkey for countermeasure works to slope failure at Montagne Ory Read More »

brasserie

La Vigie – La Brasserie – Beaux Songes Link Road

The Government through the Road Development Authority (RDA) has embarked upon the construction a new regional distributor road that will connect the M1 motorway at La Vigie, Forest Side with the Phoenix- Beau Songes link road B3 at Pierrefonds, south of Palma. Junctions are also proposed with the Vacoas-La Marie road south of La Brasserie …

La Vigie – La Brasserie – Beaux Songes Link Road Read More »

Design – Build/Turnkey for Countermeasure Works to Slope Failure at Batelage, Souillac

The project is along a stretch of 280m on B9 Road where there is a potential risk of landslide. The contractor needs to carry out a topographical survey and geotechnical investigation and to come up with a detailed design report with proposal for the countermeasure works. Same will be vetted by Ishikawa prior to implementation.​ …

Design – Build/Turnkey for Countermeasure Works to Slope Failure at Batelage, Souillac Read More »

Upgrading of Road at Palmerston, Vacoas

The Sivananda A venue and the Palmerston junction are already operating at full capacity, with heavy congestion during peak hours. With the implementation of the Metro Express Project, the Sivananda Avenue will be converted into a one-lane road and existing junctions at Vacoas and Palmerston will be signalized to synchronize metro and vehicular traffic. This …

Upgrading of Road at Palmerston, Vacoas Read More »

Interchange Constructions and Improvements along M3-A14 corridor at Ebene (Design-Build/Turnkey)

With the rapid development within the central part of the island, namely at Ebene, Reduit and Highlands and the expected increase in development at Ebene, there is a need to cater for additional traffic in these areas. Moreover, due to the traffic congestion during the peak hours, it is proposed to widen the existing fly-over along M1 Ebene. …

Interchange Constructions and Improvements along M3-A14 corridor at Ebene (Design-Build/Turnkey) Read More »

Construction of a Flyover at Quay D Roundabout (Design-Build/Turnkey)

The Quay D round about is a major access point for the port area and is currently operating beyond capacity, during both peak and off-peak hours, with subsequent queuing along Motorway M2 and adjacent roads such as Marine Road and Military Road B30.    As per the Government Programme 2020-24, with an emphasis among others on …

Construction of a Flyover at Quay D Roundabout (Design-Build/Turnkey) Read More »