On Going Projects

Construction of a Bridge at Baie du Tombeau (in lieu of Pont Bruniquel)

Bruniquel Bridge is located along Baie du Tombeau Road (B29) at about 300m from the Baie du Tombeau Roundabout on Motorway M2. The bridge was constructed in 1926 in both reinforced concrete and masonry and has a span of 11.30 m and a width of 6.0 m. However, there is no footpaths for pedestrian on …

Construction of a Bridge at Baie du Tombeau (in lieu of Pont Bruniquel) Read More »

Design – Build/Turnkey for Countermeasure Works to Slope Failure at Batelage, Souillac

The project is along a stretch of 280m on B9 Road where there is a potential risk of landslide. The contractor needs to carry out a topographical survey and geotechnical investigation and to come up with a detailed design report with proposal for the countermeasure works. Same will be vetted by Ishikawa prior to implementation.​ …

Design – Build/Turnkey for Countermeasure Works to Slope Failure at Batelage, Souillac Read More »

DRAIN WORKS ALONG A10 ROAD AT NOUVELLE FRANCE

The project consists of the construction 1.03Km of drain, demolition and reconstruction of a reinforced concrete culvert on A10 and other associated works. Click here to download project brief 0 % Progress as at August 2023

SLOPE FAILURE AT RIVIERE DES CREOLES ALONG A15 – STABILISATION WORKS (DESIGN AND BUILD/TURNKEY)

Following torrential rain on April 2021, slope failures were observed along the embankment of the South Eastern Highway (A15) at Riviere des Creoles which necessitated urgent remedial action. These failures were noted over a length of 90m along the A15 Road, starting from Grand Bel Air roundabout towards Ferney. The main reason for this failure …

SLOPE FAILURE AT RIVIERE DES CREOLES ALONG A15 – STABILISATION WORKS (DESIGN AND BUILD/TURNKEY) Read More »

Traffic Congestion Relieving Measures at B32/B143 Junction (Vallee des Pretres Region)

Vallee des Pretres is a highly built-up area, situated in Port Louis. Its main access and exit point is along Bernardin de St Pierre Road (B143), which connects to Abdool Razack Mohamed and Pamplemousse streets (B32). The second major junction in this region is the Military Road/A. R. Mohamed junction which connects Quay D to …

Traffic Congestion Relieving Measures at B32/B143 Junction (Vallee des Pretres Region) Read More »

Design-Build / Turnkey for Purging of Rock & Provision of Rock Net at Maconde Cliff

1. Problem StatementDuring the past few years, severe rockfalls had occurred during heavy rainfall endangering road users at the bottom of the cliff. This has become a recurrent problem and on several occasions the road had to be closed and traffic diverted through Baie du Cap Chamarel Case Noyal Road (B104). 2. Project LocationThe site …

Design-Build / Turnkey for Purging of Rock & Provision of Rock Net at Maconde Cliff Read More »