Upgrading of a roadside drain on the A10 Road at Plaine-Magnien (Phase 1)

The 1st phase of the project consists of the construction of 1.2 km of drains of width 2.5 m and varying depth from 1.2 m to 2.5 m connecting to the existing drain along A10 Road from Plaine-Magnien Football Ground to Motorway M1. Furthermore, a 2nd phase will have to be implemented to connect phase 1 to a safe point of discharge to ensure that there is no flooding on the M1 motorway and the surrounding regions.

Progress as at May 2025
0 %
Skip to content