Evaluation Report
- CONSULTANCY SERVICES FOR THE CONSTRUCTION OF FLIC-EN-FLAC BYPASS FROM XAVIER TO PIERREFONDS E/CS/RDA/41/03-2023
- Construction of Hermitage Bypass (CPB/82/2022)
- Upgrading of B28 Road (Lot 3-Phase 2) from Beau Champ to Bel Air – E/W/RDA/25/12-2022
- Construction of Fly-Over on Motorway M2 at Terre Rouge Roundabout (Design-Build/Turnkey) - CPB/20/2022
- Flood Mitigation Measures at Anse Jonchee along B28 road - CPB/36/2022
- Construction of Bois Cherie Bypass - CPB/10/2022
- Construction of a Grade Seperated Junction to Link the Proposed Verdun Bypass and St Pierre Bypass (Design-Build/Turnkey) - CPB/77/2021
- Construction of Grade Seperated Junction at Wootun (Design Build / Turnkey) - CPB/62/2021
- Upgrading of Constance Bridge along B117 Road at St Remi - E/W/RDA/30/03-2020
- Construction of La Brasserie- Beaux Songes Link Road - Phase 2 - CPB/66/2021
- Supply and Delivery of Guardrails and Accessories
- Interchange constructions and Improvements along M3-A14 corridor at Ebene (Design-Build/Turnkey)
- Slope Failure at Riviere des Creoles along A15 - Stabilisation Works (Design & Build/Turnkey)
- Construction of a Flyover at Quay D Roundabout (Design-Build/Turnkey)
- Design - Build/Turnkey for Purging of Rock & Provision of Rock Net at Maconde Cliff
- Construction of Verdun Bypass
- Drainworks along A10 Road at Nouvelle France
- La Vigie - La Brasserie - Beaux Songes Link Road - Phase 1
- Motorway M4 from Airport-Phase 1 : Construction of a Single Carriageway from Bel Air to Pont Blanc - Prequalification
- Framework Agreement for Maintenance and Minor Works (2020-2023)
- Rehabilitation of Napoleon Bridge at L'Avenir along Ripailles-Nicoliere Road (B49)
- Construction of Saint Denis Bridge at Chamarel
- Upgrading of Road at Palmerston, Vacoas
- Counter Measures Works To Slope Failure At Montagne Ory
- Improvement of bend at Nouvelle Decouverte - W/RDA/32/02-18
- Improvement of bend at Nouvelle Decouverte - W/RDA/32/02-18
- Construction of an Interchange at Hillcrest across Motorway M1 (Design-Build/Turney)
- Construction of La Croisette/Grand Baie Link Road - W/RDA/16/09-18
- Design-Build/Turnkey and Completion of Construction of A1-A3 Link Road
- Construction of a Bypass at Cap Malheureux
- Construction of Ste Marie Bridge on B9 Road at Baie Jacotet
- Evaluation Report Section to The Construction of Grade Seperated Junctions at Pont Fer/Jumbo/Do
- Construction of an access road at Fort William
- Reconstruction of Baie du Cap–Chamarel–Case Noyale (B104) Road at Chamarel. (CS/RDA/12/09-17)
- Design-build/turnkey and completion of the construction of a grade seperated junction on the M1 at Deschartres street and other upgrading works.
- Framework Agreement for Maintenance and Minor Works (2017-2020)
- Framework Agreement for Maintenance and Minor Works (2014-2016)
- Corrigendum - Framework Agreement for Maintenance and Minor Works
- Terre Rouge - Verdun Link Road : Treatment of Landslides and Remaining Roadworks on Southbound Carriageway at Ripailles
- Reconstruction of Black River Bridge at Grande Riviere Noire
- Construction of a new Access Road to SSR International Airport
- Construction of third lane to Grand Bassin along B88 Road from Gouly to Bois Cheri
- Repair to embankment on Motorway M3 at Ripailles
- Construction of St Julien Bypass from St Julien D'Hotman to Bel Etang
- Upgrading of Radier St Martin at Bel Ombre