Major Projects

Construction of a Grade Separated Junction at Wooton

The Grade Separated Junction at Wooton project is part of the concept review and trafficmanagement plan to improve the Northbound-Southbound & Southbound – Northbound throughtraffic and to reduce traffic congestion and travel time along Motorway M1 and Quartier Militaire Road (B6) on both sides of the interchange at Wooton through uninterrupted traffic flow. 0 % …

Construction of a Grade Separated Junction at Wooton Read More »

Interchange Construction and Improvement along M3-A14 corridor at Ebene

The existing road network at Ebene, including the Ebene Flyover was constructed in the year 2002 to 2004, in the context of the Ebene Cybercity development. The rapid development within the central part of the island, namely at Ebene, Reduit, Moka and Highlands has caused saturation of the existing road network. During morning peak hours, …

Interchange Construction and Improvement along M3-A14 corridor at Ebene Read More »

Construction of a Fly-Over on Motorway M2 at Terre Rouge Roundabout (Design-Build/Turnkey)

The Terre Rouge roundabout are currently operating beyond capacity, during both peak and off-peak hours, with subsequent queuing along Motorway M2 and adjacent roads. In view to address this problem a flyover is being constructed on Motorway M2 at the Terre Rouge Roundabout and the traffic movements will be re configured.RDA is undertaking the above …

Construction of a Fly-Over on Motorway M2 at Terre Rouge Roundabout (Design-Build/Turnkey) Read More »

Skip to content