Completed Projects

Upgrading of B28 Road(Lot 3) from Deux Frères to Beau Champ (Phase 1)

The project will, inter-alia, provide a safer road to road users and pedestrians;contribute to boost economic development in that region; help in developing the tourism sector in that area by providing better connectivity; and increase the level of service by reducing traffic C and vehicle operating costs. 0 % Completed Click here to download project …

Upgrading of B28 Road(Lot 3) from Deux Frères to Beau Champ (Phase 1) Read More »

Rehabilitation of Napoléon Bridge at L’Avenir on Ripailles – Nicolière Road (B49)

The bridge was constructed in 1965 and is located on B49 Road next to L’Avenir Temple. It is approximately 35m long and 5.5m wide and is made up of a reinforced concrete deck resting on 3 Nos. reinforced concrete beams supported by an intermediate masonry pier and masonry abutments.  The absence of footpath along the …

Rehabilitation of Napoléon Bridge at L’Avenir on Ripailles – Nicolière Road (B49) Read More »

Upgrading of Road at Palmerston, Vacoas

The Sivananda A venue and the Palmerston junction are already operating at full capacity, with heavy congestion during peak hours. With the implementation of the Metro Express Project, the Sivananda Avenue will be converted into a one-lane road and existing junctions at Vacoas and Palmerston will be signalized to synchronize metro and vehicular traffic. This …

Upgrading of Road at Palmerston, Vacoas Read More »

Landslide/Slope Stability Treatment along B104 road (Baie du Cap – Chamarel – Case Noyale) at Chamarel

The B104 road consists of several dangerous curves with mountain vertical slopes on one side over 25 m high and ravines on the other side. The road is about 6 m wide with enlargement at the curves and at viewpoints. This road is the major link between the western Coast and the Central Plateau. Over …

Landslide/Slope Stability Treatment along B104 road (Baie du Cap – Chamarel – Case Noyale) at Chamarel Read More »

The Construction of Grade Separated Junctions at PontFerJumboDowlut roundabouts

On 30th March 2018, the Government of Mauritius and the Road Development Authority (RDA) launched the construction of the Grade Separated Junctions at Pont Fer/Jumbo/Dowlut roundabouts, as part of the Road Decongestion Programme. This multi-billion rupee mega project is critical to the main transport corridor in Mauritius to reduce congestion time and costs(currently estimated at …

The Construction of Grade Separated Junctions at PontFerJumboDowlut roundabouts Read More »

Skip to content