Rehabilitation of Napoléon Bridge at L’Avenir on Ripailles – Nicolière Road (B49)

The bridge was constructed in 1965 and is located on B49 Road next to L’Avenir Temple. It is approximately 35m long and 5.5m wide and is made up of a reinforced concrete deck resting on 3 Nos. reinforced concrete beams supported by an intermediate masonry pier and masonry abutments. 

The absence of footpath along the bridge represents a potential hazard for pedestrians. The geometry of the approach from La Laura/Beau Bois is below current highway standards. Moreover, the bridge shows signs of moderate structural deterioration. Hence, the need for timely rehabilitation.