Skip Ribbon Commands
Skip to main content
Road Development Authority
Road Development Authority>News>Reconstruction of Albion Bridge

News

Average Rating

Related News

Reconstruction of Albion Bridge

albion
Date: April 17, 2019
Domain:Completed Projects
 

 

This project forms part of the emergency works initiated by the Government of Mauritius to
alleviate the flooding problems in the village of Albion. The existing structure is of
reinforced concrete box culverts with dimensions 2.30m x 6.0m x 0.90m. During heavy
rainfall, the culverts are flooded with the increasing volume of water from the river, and the
road above become inaccessible to the inhabitants. Alternative route onto lateral roads can be
used to access on the Albion Road, B78 through the lighthouse. The new bridge will be of
dimension 11.0m x 7.0m x 1.60 m.
​​

(0) Comment(s)