Completed Projects

Landslide/Slope Stability Treatment along B104 road (Baie du Cap – Chamarel – Case Noyale) at Chamarel

The B104 road consists of several dangerous curves with mountain vertical slopes on one side over 25 m high and ravines on the other side. The road is about 6 m wide with enlargement at the curves and at viewpoints. This road is the major link between the western Coast and the Central Plateau. Over …

Landslide/Slope Stability Treatment along B104 road (Baie du Cap – Chamarel – Case Noyale) at Chamarel Read More »

The Construction of Grade Separated Junctions at PontFerJumboDowlut roundabouts

On 30th March 2018, the Government of Mauritius and the Road Development Authority (RDA) launched the construction of the Grade Separated Junctions at Pont Fer/Jumbo/Dowlut roundabouts, as part of the Road Decongestion Programme. This multi-billion rupee mega project is critical to the main transport corridor in Mauritius to reduce congestion time and costs(currently estimated at …

The Construction of Grade Separated Junctions at PontFerJumboDowlut roundabouts Read More »

Construction of an Interchange at Hillcrest across Motorway M1

Access to Quatre Bornes from the North and East is provided mainly through the St Jean Roundabout.The roundabout also serves as a major access point to complexes such as La Cite Trianon & Emerald Park Ltee. Traffic is congested at St Jean Road(A8) and St Jean roundabout during peak hours. Both the St Jean Interchange …

Construction of an Interchange at Hillcrest across Motorway M1 Read More »

A1-A3 Link Road

The A1-A3 Link Road will connect the Port Louis-St Jean Road (A1) to the Black River Road (A3). With upcoming development in the region, this link will provide a rapid link connection between the West and Port Louis/North and vice versa. The road will start from its intersection with A1 Road at Coromandel with tie-in …

A1-A3 Link Road Read More »

nouvelle decouverte

Improvement of bend at Nouvelle Decouverte

The project is located is located on B15 Road at Poste de Flacq. It comprises the construction of 500 meters of single carriageway including the construction of a new bridge. Click here to view the Project Brief.

Upgrading of Pointe Aux Sables Road (B31) at Petit Verger

Pointe aux Sables is a highly residential area located in the suburb of Port Louis. The upgrading of the B31 was proposed by the RDA starting from its junction with Albion Road (B78) to the Bus terminus at Petit Verger, Pointe aux Sables. Click here to view the Project Brief.​​

Cap Malheureux Bypass

The project consists of the construction of a new 7.0m wide single carriageway road of 2.2km to link Chemin Vingt Pieds and Mont Choisy Cap Malheureux Road (B13) at Anse La Raie in view to reduce traffic congestion and enhance road safety at Cap Malheureux. The works also involve the upgrading of part of B13 …

Cap Malheureux Bypass Read More »

Skip to content