Completed Projects

St Julien ByPass

On Tuesday 21st Aug 2018, the opening of the St Julien Bypass (co-project between the Road Development Authority, Mauritius and Transinvest Contruction Ltd) was inaugurated by Hon Pravind Kumar JUGNAUTH, Prime Minister of Mauritius. The St Julien Bypass starts with a roundabout along Higginson (B24) Road before the village of St Julien d’Hotman, bypasses the …

St Julien ByPass Read More »

Third Lane at Grand Bassin

The site of the works is located along P.J.G.G.N (Grand Bassin) Road (B88) from Gouly to Bois Cheri over a length of 2.0 km. The average width of the existing road (B88) varies between 6.0 and 6.5 meters. The existing two bridges along the road have also been widened and upgraded Click here to view …

Third Lane at Grand Bassin Read More »

Arsenal Link Road

Arsenal Link Road

A direct link between the end of M3 at Terre Rouge to the Arsenal Barracks Road at Calebasses. The link road has been designed as a two lane carriageway of approximate length of 450 metres and width of  7 metres. Two shoulders of width 1.5 metres on each side of the road has also been …

Arsenal Link Road Read More »

Skip to content