{"id":6930,"date":"2024-07-03T11:22:56","date_gmt":"2024-07-03T07:22:56","guid":{"rendered":"https:\/\/rda.govmu.org\/rda\/?p=6930"},"modified":"2024-11-20T10:41:07","modified_gmt":"2024-11-20T06:41:07","slug":"construction-of-a-bridge-at-baie-du-tombeau-in-lieu-of-pont-bruniquel","status":"publish","type":"post","link":"https:\/\/rda.govmu.org\/rda\/?p=6930","title":{"rendered":"Construction of a Bridge at Baie du Tombeau (in lieu of Pont Bruniquel)"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"6930\" class=\"elementor elementor-6930\" data-elementor-post-type=\"post\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-5f354ea4 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"5f354ea4\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-74664d44\" data-id=\"74664d44\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-11c5057b elementor-widget elementor-widget-text-editor\" data-id=\"11c5057b\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Bruniquel Bridge is located along Baie du Tombeau Road (B29) at about 300m from the Baie du Tombeau Roundabout on Motorway M2. The bridge was constructed in 1926 in both reinforced concrete and masonry and has a span of 11.30 m and a width of 6.0 m. However, there is no footpaths for pedestrian on the sides of the bridges. The existing bridge is in a deplorable state. Moreover, the traffic flow in both directions is quite high and includes a high percentage of heavy vehicles.&nbsp;&nbsp;<\/p><p>The RDA intends to construct a new bridge in lieu of Bruniquel Bridge of appropriate length\/ section and width 12m which will cater for both 2 ways traffic and footpaths for pedestrian, to the required international standards and also to realign the existing approaches so as to eliminate sharp bends, improve visibility, and minimize risks of accidents.&nbsp;<\/p><ol>\n<\/ol>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-0603c7c elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"0603c7c\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-c695cc7 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"c695cc7\" data-element_type=\"section\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-39b7722\" data-id=\"39b7722\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-d482efd elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"d482efd\" data-element_type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<a href=\"https:\/\/rda.govmu.org\/rda\/wp-content\/uploads\/2023\/05\/Bruniquel-Brigde_ProjectBrief.pdf\" target=\"_blank\">\n\n\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"fas fa-check\"><\/i>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Click here to view the Project Brief<\/span>\n\t\t\t\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-322892c\" data-id=\"322892c\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-348c398 elementor-widget elementor-widget-counter\" data-id=\"348c398\" data-element_type=\"widget\" data-widget_type=\"counter.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-counter\">\n\t\t\t<div class=\"elementor-counter-title\">Completed<\/div>\t\t\t<div class=\"elementor-counter-number-wrapper\">\n\t\t\t\t<span class=\"elementor-counter-number-prefix\"><\/span>\n\t\t\t\t<span class=\"elementor-counter-number\" data-duration=\"4000\" data-to-value=\"100\" data-from-value=\"0\" data-delimiter=\",\">0<\/span>\n\t\t\t\t<span class=\"elementor-counter-number-suffix\">%<\/span>\n\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Bruniquel Bridge is located along Baie du Tombeau Road (B29) at about 300m from the Baie du Tombeau Roundabout on Motorway M2. The bridge was constructed in 1926 in both reinforced concrete and masonry and has a span of 11.30 m and a width of 6.0 m. However, there is no footpaths for pedestrian on &hellip;<\/p>\n<p class=\"read-more\"> <a class=\"\" href=\"https:\/\/rda.govmu.org\/rda\/?p=6930\"> <span class=\"screen-reader-text\">Construction of a Bridge at Baie du Tombeau (in lieu of Pont Bruniquel)<\/span> Read More &raquo;<\/a><\/p>\n","protected":false},"author":6,"featured_media":6929,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[14],"tags":[111,112],"class_list":["post-6930","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-completed-projects","tag-baie-du-tombeau","tag-bridge"],"wpmagazine_modules_lite_featured_media_urls":{"thumbnail":["https:\/\/rda.govmu.org\/rda\/wp-content\/uploads\/2023\/05\/Bruniqel_Bridge-150x150.jpg",150,150,true],"cvmm-medium":["https:\/\/rda.govmu.org\/rda\/wp-content\/uploads\/2023\/05\/Bruniqel_Bridge.jpg",300,167,false],"cvmm-medium-plus":["https:\/\/rda.govmu.org\/rda\/wp-content\/uploads\/2023\/05\/Bruniqel_Bridge.jpg",305,170,false],"cvmm-portrait":["https:\/\/rda.govmu.org\/rda\/wp-content\/uploads\/2023\/05\/Bruniqel_Bridge.jpg",400,223,false],"cvmm-medium-square":["https:\/\/rda.govmu.org\/rda\/wp-content\/uploads\/2023\/05\/Bruniqel_Bridge.jpg",600,335,false],"cvmm-large":["https:\/\/rda.govmu.org\/rda\/wp-content\/uploads\/2023\/05\/Bruniqel_Bridge.jpg",685,382,false],"cvmm-small":["https:\/\/rda.govmu.org\/rda\/wp-content\/uploads\/2023\/05\/Bruniqel_Bridge.jpg",130,72,false],"full":["https:\/\/rda.govmu.org\/rda\/wp-content\/uploads\/2023\/05\/Bruniqel_Bridge.jpg",685,382,false]},"categories_names":{"14":{"name":"Completed Projects","link":"https:\/\/rda.govmu.org\/rda\/?cat=14"}},"tags_names":{"111":{"name":"Baie du Tombeau","link":"https:\/\/rda.govmu.org\/rda\/?tag=baie-du-tombeau"},"112":{"name":"Bridge","link":"https:\/\/rda.govmu.org\/rda\/?tag=bridge"}},"comments_number":"0","_links":{"self":[{"href":"https:\/\/rda.govmu.org\/rda\/index.php?rest_route=\/wp\/v2\/posts\/6930","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rda.govmu.org\/rda\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rda.govmu.org\/rda\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/rda.govmu.org\/rda\/index.php?rest_route=\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/rda.govmu.org\/rda\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=6930"}],"version-history":[{"count":37,"href":"https:\/\/rda.govmu.org\/rda\/index.php?rest_route=\/wp\/v2\/posts\/6930\/revisions"}],"predecessor-version":[{"id":8706,"href":"https:\/\/rda.govmu.org\/rda\/index.php?rest_route=\/wp\/v2\/posts\/6930\/revisions\/8706"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/rda.govmu.org\/rda\/index.php?rest_route=\/wp\/v2\/media\/6929"}],"wp:attachment":[{"href":"https:\/\/rda.govmu.org\/rda\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=6930"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rda.govmu.org\/rda\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=6930"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rda.govmu.org\/rda\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=6930"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}