{"id":3923,"date":"2018-08-21T15:39:32","date_gmt":"2018-08-21T11:39:32","guid":{"rendered":"https:\/\/rda.govmu.org\/rda\/?p=3923"},"modified":"2021-12-02T15:45:36","modified_gmt":"2021-12-02T11:45:36","slug":"st-julien-bypass","status":"publish","type":"post","link":"https:\/\/rda.govmu.org\/rda\/?p=3923","title":{"rendered":"St Julien ByPass"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"3923\" class=\"elementor elementor-3923\" data-elementor-post-type=\"post\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-b96ca3c elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"b96ca3c\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-b24a5e8\" data-id=\"b24a5e8\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-5071c6b elementor-widget elementor-widget-text-editor\" data-id=\"5071c6b\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>On Tuesday 21st Aug 2018, the opening of the St Julien Bypass (co-project between the Road Development Authority, Mauritius and Transinvest Contruction Ltd) was inaugurated by Hon Pravind Kumar JUGNAUTH, Prime Minister of Mauritius. The St Julien Bypass starts with a roundabout along Higginson (B24) Road before the village of St Julien d\u2019Hotman, bypasses the village over a total stretch of 3.5km and ends with a T-Junction along B24 Road.\u00a0<\/p><div><p>The project will:<\/p><ul><li>Improve road geometry and enhance safety for both pedestrians and vehicles.<\/li><li>Bypass existing built up areas at St Julien d\u2019Hotman Village, ensuring the safety of residents.<\/li><li>Decrease travel time and vehicle operating costs.<\/li><\/ul><\/div><p><a href=\"https:\/\/www.youtube.com\/watch?v=cOYYJosTZuc\" target=\"_blank\" rel=\"noopener\">Click here to view Drone View Video of the project<\/a><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>On Tuesday 21st Aug 2018, the opening of the St Julien Bypass (co-project between the Road Development Authority, Mauritius and Transinvest Contruction Ltd) was inaugurated by Hon Pravind Kumar JUGNAUTH, Prime Minister of Mauritius. The St Julien Bypass starts with a roundabout along Higginson (B24) Road before the village of St Julien d\u2019Hotman, bypasses the &hellip;<\/p>\n<p class=\"read-more\"> <a class=\"\" href=\"https:\/\/rda.govmu.org\/rda\/?p=3923\"> <span class=\"screen-reader-text\">St Julien ByPass<\/span> Read More &raquo;<\/a><\/p>\n","protected":false},"author":6,"featured_media":3925,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[14],"tags":[24],"class_list":["post-3923","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-completed-projects","tag-24"],"wpmagazine_modules_lite_featured_media_urls":{"thumbnail":["https:\/\/rda.govmu.org\/rda\/wp-content\/uploads\/2018\/08\/stJulien-150x150.jpg",150,150,true],"cvmm-medium":["https:\/\/rda.govmu.org\/rda\/wp-content\/uploads\/2018\/08\/stJulien.jpg",300,169,false],"cvmm-medium-plus":["https:\/\/rda.govmu.org\/rda\/wp-content\/uploads\/2018\/08\/stJulien.jpg",305,172,false],"cvmm-portrait":["https:\/\/rda.govmu.org\/rda\/wp-content\/uploads\/2018\/08\/stJulien.jpg",320,180,false],"cvmm-medium-square":["https:\/\/rda.govmu.org\/rda\/wp-content\/uploads\/2018\/08\/stJulien.jpg",320,180,false],"cvmm-large":["https:\/\/rda.govmu.org\/rda\/wp-content\/uploads\/2018\/08\/stJulien.jpg",320,180,false],"cvmm-small":["https:\/\/rda.govmu.org\/rda\/wp-content\/uploads\/2018\/08\/stJulien.jpg",130,73,false],"full":["https:\/\/rda.govmu.org\/rda\/wp-content\/uploads\/2018\/08\/stJulien.jpg",320,180,false]},"categories_names":{"14":{"name":"Completed Projects","link":"https:\/\/rda.govmu.org\/rda\/?cat=14"}},"tags_names":{"24":{"name":"2018","link":"https:\/\/rda.govmu.org\/rda\/?tag=2018"}},"comments_number":"0","_links":{"self":[{"href":"https:\/\/rda.govmu.org\/rda\/index.php?rest_route=\/wp\/v2\/posts\/3923","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rda.govmu.org\/rda\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rda.govmu.org\/rda\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/rda.govmu.org\/rda\/index.php?rest_route=\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/rda.govmu.org\/rda\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3923"}],"version-history":[{"count":5,"href":"https:\/\/rda.govmu.org\/rda\/index.php?rest_route=\/wp\/v2\/posts\/3923\/revisions"}],"predecessor-version":[{"id":3929,"href":"https:\/\/rda.govmu.org\/rda\/index.php?rest_route=\/wp\/v2\/posts\/3923\/revisions\/3929"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/rda.govmu.org\/rda\/index.php?rest_route=\/wp\/v2\/media\/3925"}],"wp:attachment":[{"href":"https:\/\/rda.govmu.org\/rda\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3923"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rda.govmu.org\/rda\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3923"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rda.govmu.org\/rda\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3923"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}