Skip Ribbon Commands
Skip to main content
Road Development Authority

News

New Access Road to SSR Airport

Date:July 26, 2017|Domain:Completed Projects

A new access that caters for generated additional volume of traffic and also for future developments in the region. The length of road is 4.5 km dual carriageway, 7.3 m  wide with hard shoulders, drains/ culverts, road lighting and guard railing as


Arsenal Link Road

Date:July 15, 2017|Domain:Completed Projects

A direct link between the end of M3 at Terre Rouge to the Arsenal Barracks Road at Calebasses. The link road has been designed as a two lane carriageway of approximate length of 450 metres and width of  7 metres. Two shoulders of width 1.5 metres on